Architect: Justin A. Mihalik, AIA
Project Description:
Interior renovation to the church. First, structural repairs were performed to the concrete slab. An anti-crack membrane was designed and installed to ensure tile flooring would remain intact. Approximately 10,000 s.f. of Porcelain Tile was installed throughout the church. Altar was redesigned and built with extra structural support.
The altar was complimented with a combination of Porcelain Tile and Marble Steps & Treads imported from overseas. All church pews were removed and stored at an offsite location where they were refinished and then reinstalled.