St. Joseph and Michael's Church suffered the tragedy of a fire that damaged the entire structural integrity of the roof trusses and the interior. It wasn't long before the $6,000,000.00 restoration of Phase 1 & 2 began. Phase 1 started with removing the charred deteriorated roof trusses, replacing with new trusses, and roof. Not long after the structure was stabilized, phase 2 restoration began. A full interior gut job was underway. All new HVAC, electric, plastering, painting, organ, porcelain tile floor, altar, pews, steeple, sound system, bathrooms, window replacement, exterior restoration, sidewalks, and parking lot.
Malanga Construction Co., Inc.
General Contractor